My Blog

Case Study 94: 2017 Pavement Maintenance

Case Study 94: 2017 Pavement Maintenance

Location:
Tumwater, WA
Date:
July, 2017
Product:
7,800 Tons of FORTA-FI® Reinforced Asphalt, 17,814 SY’s of RG1010 High Strength Paving Grid Interlayer.
Engineer:
Lakeside Industries
Contractor:
Lakeside Industries


userCase Study 94: 2017 Pavement Maintenance