PGS approaches DOTs’ unique roadways with reinforced solutions that ensure the entire pavement system – from surface to subgrade – is set up to maintain proper roadway integrity and safety. PGS’s solutions reduce the need for frequent maintenance and roadway closures.

PGS Engineering:

– Pavement Management
– Site Investigation
– Pavement Design
– Expert Advice

Areas of expertise:

– More Durable, Longer Lasting Pavements
– Maintenance Backlog Reduction
– Base & Subgrade Stabilization
– 100% RAP Pavements
– Slurry & Micro-surfacing
– Concrete Overlays
– Reflective Crack Mitigation

PGS Engineering:

  • Pavement Management
  • Site Investigation
  • Pavement Design
  • Expert Advice

Areas of expertise:

  • More Durable, Longer Lasting Pavements
  • Maintenance Backlog Reduction
  • Base & Subgrade Stabilization
  • 100% RAP Pavements
  • Slurry & Micro-surfacing
  • Concrete Overlays
  • Reflective Crack Mitigation

PGS approaches DOTs’ unique roadways with reinforced solutions that ensure the entire pavement system – from surface to subgrade – is set up to maintain proper roadway integrity and safety. PGS’s solutions reduce the need for frequent maintenance and roadway closures.

FEATURED PROJECTS

NEW YORK DOT

DOT
  • $50-$100/SY

    Savings

  • ELIMINATED

    Additional Work Zones

  • SUCCESSFUL

    Reflective Crack Mitigation

As NYDOT sought solutions to mitigate reflective cracking, the standard approach included a 6-in mill and replace, with polymer modified binder over existing transverse cracks prior to a 2-in mill and overlay. Typical costs ranged from $50 to $100/SY and required extensive labor and time, additional work zones, and increased safety concerns.

Utilizing PGS strategies, James Jordan of NYDOT highlighted the value, which includes:
1) reduction in reflective cracking 2) Reduced cost 3) Less work zone exposure 4) Simplified project work and ease of implementation 5) Delayed maintenance needs

New York DOT

As NYDOT sought solutions to mitigate reflective cracking, the standard approach included a 6-in mill and replace, with polymer modified binder over existing transverse cracks prior to a 2-in mill and overlay. Typical costs ranged from $50 to $100/SY and required extensive labor and time, additional work zones, and increased safety concerns.

Utilizing PGS strategies, James Jordan of NYDOT highlighted the value, which includes:
1) reduction in reflective cracking 2) Reduced cost 3) Less work zone exposure 4) Simplified project work and ease of implementation 5) Delayed maintenance needs

DOT
  • $50-$100/SY

    Savings

  • ELIMINATED

    Additional Work Zones

  • SUCCESSFUL

    Reflective Crack Mitigation

utah dot: I-15 - Black Ridge, Brush Wellman Rd

UDOT has recognized the performance benefit of relying on PGS, with projects totaling nearly 90,000 tons of asphalt in 2020 alone. Each project has targeted a specific goal.

on I-15 Black Ridge, we helped consultants and UDOT personnel increase structural capacity and mitigate reflective cracking, all while maintaining their budget and keeping costs low.

On Brush Wellman rd, an FHWA funded joint venture between UDOT and Millard County, we were able to extend pavement design life and ease the future maintenance burden on the county.

  • 88,316 Tons

    Combined Project Size

  • EXTENDED

    Pavement Design Life

  • SUCCESSFUL

    Reflective Crack Mitigation

utah dot: I-15 - Black Ridge, Brush Wellman Rd

  • 88,316 Tons

    Combined Project Size

  • EXTENDED

    Pavement Design Life

  • SUCCESSFUL

    Reflective Crack Mitigation

UDOT has recognized the performance benefit of relying on PGS, with projects totaling nearly 90,000 tons of asphalt in 2020 alone. Each project has targeted a specific goal.

on I-15 Black Ridge, we helped consultants and UDOT personnel increase structural capacity and mitigate reflective cracking, all while maintaining their budget and keeping costs low.

On Brush Wellman rd, an FHWA funded joint venture between UDOT and Millard County, we were able to extend pavement design life and ease the future maintenance burden on the county.

MODOT I-270

The interchange at I-270 & I-70 is recognized as one of the busiest interchanges in the country. When it was time for an overlay, MoDOT trusted Pacific GeoSource to reinforce it.

As a result…

“The improved asphalt pavement will provide the safest and smoothest surface for the traveling public and industries moving their product for years to come.”
– Missouri Asphalt Pavement Association

  • TRUSTED

    by MoDOT

  • INCREASED PAVEMENT LIFE

  • REDUCED MAINTENANCE

MODOT I-270

  • TRUSTED

    by MoDOT

  • INCREASED PAVEMENT LIFE

  • REDUCED MAINTENANCE

The interchange at I-270 & I-70 is recognized as one of the busiest interchanges in the country. When it was time for an overlay, MoDOT trusted Pacific GeoSource to reinforce it.

As a result…

“The improved asphalt pavement will provide the safest and smoothest surface for the traveling public and industries moving their product for years to come.”
– Missouri Asphalt Pavement Association

let’s chat