PGS minimizes future parking lot repair cost through our value-engineered approach. Our reinforced, value-engineered solutions increase pavement durability and optimize pavement performance for short-term and long-term cost savings.

PGS Engineering:

– Pavement Management
– Site Investigation
– Pavement Design
– Expert Advice

Areas of expertise:

– More Durable, Longer Lasting Pavements
– Reduced Maintenance
– Base & Subgrade Stabilization
– 100% RAP Pavements
– Concrete Overlays
– Reflective Crack Mitigation

PGS Engineering:

  • Pavement Management
  • Site Investigation
  • Pavement Design
  • Expert Advice

Areas of expertise:

  • More Durable, Longer Lasting Pavements
  • Reduced Maintenance
  • Base & Subgrade Stabilization
  • 100% RAP Pavements
  • Concrete Overlays
  • Reflective Crack Mitigation

PGS minimizes future parking lot repair cost through our value-engineered approach. Our reinforced, value-engineered solutions increase pavement durability and optimize pavement performance for short-term and long-term cost savings.

FEATURED PROJECTS

bOEING - mESA, az

Commercial
  • NEAR PERFECT CONDITION

    After 10 years

  • THERMAL CRACKING RESISTANCE

  • REDUCED PROJECT COSTS

When it was time to repair the drive aisles at their Mesa, AZ facility, Boeing turned to Pacific GeoSource to reinforce their asphalt.

Our reinforcement solutions provided resistance to thermal cracking, extended pavement life, and reduced project costs.

After 10 years of service, the reinforced section is in near-perfect condition!

bOEING - mESA, az

When it was time to repair the drive aisles at their Mesa, AZ facility, Boeing turned to Pacific GeoSource to reinforce their asphalt.

Our reinforcement solutions provided resistance to thermal cracking, extended pavement life, and reduced project costs.

After 10 years of service, the reinforced section is in near-perfect condition!

Commercial
  • NEAR PERFECT CONDITION

    After 10 years

  • THERMAL CRACKING RESISTANCE

  • REDUCED PROJECT COSTS

lba logistics (ruffin rd)

As the owner of this industrial property prepared for new tenants to move in, they needed to improve the badly cracked parking lot. Because of budget constraints, a complete reconstruction was out of the question.

The owner turned to Pacific GeoSource for our innovative pavement reinforcement solutions.

After addressing reflective cracking, we approached the project with a reinforced overlay, providing a durable surface that will stand up to heavy traffic for years to come.

  • >50%

    Extended Overlay Life

  • RECONSTRUCTION AVOIDED

lba logistics (ruffin rd)

  • >50%

    Extended Overlay Life

  • RECONSTRUCTION AVOIDED

As the owner of this industrial property prepared for new tenants to move in, they needed to improve the badly cracked parking lot. Because of budget constraints, a complete reconstruction was out of the question.

The owner turned to Pacific GeoSource for our innovative pavement reinforcement solutions.

After addressing reflective cracking, we approached the project with a reinforced overlay, providing a durable surface that will stand up to heavy traffic for years to come.

MASTERCARD - O'FALLON, MO

With company growth and an increasing number of employees driving to work, a new parking lot was needed at the Mastercard Headquarters in O’Fallon, MO.

In addition to increased performance and enhanced durability provided by our reinforced pavement solutions, the construction schedule was accelerated, and disruptions to operations were minimized.

  • SIMPLIFIED INSTALLATION

  • ACCELERATED PROJECT COMPLETION

  • INCREASED STRUCTURAL CAPACITY & DURABILITY

MASTERCARD - O'FALLON, MO

  • SIMPLIFIED INSTALLATION

  • ACCELERATED PROJECT COMPLETION

  • INCREASED STRUCTURAL CAPACITY & DURABILITY

With company growth and an increasing number of employees driving to work, a new parking lot was needed at the Mastercard Headquarters in O’Fallon, MO.

In addition to increased performance and enhanced durability provided by our reinforced pavement solutions, the construction schedule was accelerated, and disruptions to operations were minimized.